Click on an image to enter gallery

Customer:   NBN Australia

Project: Next Generation Broadband Network

Requirement:   Raise the height of a connected Fibre-to-the Node (FTTN) Nokia cabinet subject to flooding with minimal disruption to customers or cable connections.

Solution:  Velnah developed a portable and modular 300 or 600mm high cutover plinth with the ability to be installed in under a day without disconnecting customers or cables. The modular design construction withstands high static loads and complies with Australian cyclone rated regions A & B.

Produced from marine grade aluminium, the product features ready access panels and backfilling capability.